The nature of payment problems in the New Zealand construction industry

Ramachandra, T; Rotimi, J.O.B.
Thumbnail
View/Open
2011 Australasian Journ of Const Econs and Bldg.pdf (393.3Kb)
Permanent link
http://hdl.handle.net/10292/5796
Metadata
Show full metadata
Abstract
Delay and loss of payment is a serious problem in the construction industry of many countries. These affect the cash flow of contractors which is critical to meeting their financial obligations. Payment defaults by the principal leads to insolvency of contractors and in turn other parts of the project chain. In recognition of some of these problems, most countries have established payment-specific construction industry legislation and other contractual measures to mitigate the problems, but nevertheless the problem persists. In this context, the paper examines the nature of payment problems in the construction industry in New Zealand. It is part of a larger study, that seeks solutions to payment losses in the construction industry.The study uses two approaches; an analysis of liquidators’ reports, and an analysis of court cases involving payment disputes to determine the magnitude of payment problems on construction parties. The findings are presented using simple descriptive and interpretive analyses. The study finds that trade creditors are impacted negatively (payment delays and losses) by the liquidation of property developers, general construction and construction trade companies. 75% of trade creditors are unable to be paid fully by these categories of construction companies after liquidation proceedings. Liquidation proceedings take an average 18 months before they are finalised. The analysis of court cases found that 80% of payment disputes are between principals and contractors; with considerably significant percentage of disputes resulting in outright loss of payments. Only 40% of the cases are successful, in which case claimants are able to fully recover the amount in dispute. Payment losses are more prevalent in liquidation than delays and unlike in legal disputes, there is no security for those losses. The study finds that construction parties use remedies contained in the security of payment provisions within standard conditions of contract, and legislative documents.
Keywords
Payment loss; Payment disputes; Liquidation; Construction Industry; New Zealand
Date
2011
Source
Australasian Journal of Construction Economics and Building, vol.11(2), pp.22 - 33 (12)
Item Type
Journal Article
Publisher
University of Technology Sydney (UTS) ePress
Publisher's Version
http://epress.lib.uts.edu.au/ojs/index.php/AJCEB
Rights Statement
The Australasian Journal of Construction Economics and Building is a peer reviewed, open access publication, free to both readers and authors, for original research into all aspects of the economics and management of building and construction, quantity surveying and property management.

Contact Us
  • Admin

Hosted by Tuwhera, an initiative of the Auckland University of Technology Library

 

 

Browse

Open ResearchTitlesAuthorsDateSchool of Engineering, Computer & Mathematical SciencesTitlesAuthorsDate

Alternative metrics

 

Statistics

For this itemFor all Open Research

Share

 
Follow @AUT_SC

Contact Us
  • Admin

Hosted by Tuwhera, an initiative of the Auckland University of Technology Library